|
| image = | image_width = 265px | image_alt = | caption = | type = Rapid transit | system = Shanghai Metro | status = Planned | locale = Shanghai, China | start = | end = | stations = | routes = | ridership = | open = | close = | owner = | operator = | character = | depot = | stock = | linelength = | tracklength = | notrack = | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} Line 19, formerly is treated as the last phase for Line 9, is a line on the Shanghai Metro that is part of the 2010~2020 Shanghai Metro plan and is planned to enter operation by 2020. Line 19 starts from Chuanqiao Road in Pudong, via the Shanghai Yangtze River Tunnel and the Shanghai Yangtze River Bridge to Chongming Island, Chongming County, and it will have a branch line from Changxing Island to Hengsha Island. This line can interchange with Lines 9, 12 and 14. 〔(上海轨道交通12至20号线线路站点和规划图(通青浦奉贤崇明) )〕 ==Planned stations== *Chuanqiao Road - Interchange with Line 14 *Rongqiao Road - Interchange with Line 9 *Shenjiang Road - Interchange with Line 12 *Changxing Island 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 19, Shanghai Metro」の詳細全文を読む スポンサード リンク
|